Projects under Construction By Al-Qabas Company

 

#

Client

Scope of project

Location

Duration

Start / End

%

Completed

1.             

JV HDGSK ( Hundayi Co., GSE Co. & SK Co.).

Karbala Refinery Project PKG 7

Karbala/Iraq

Sep/2015-May2018

58%

2.             

JV HDGSK ( Hundayi Co., GSE Co. & SK Co.).

Karbala Refinery Project PKG 8

Karbala/Iraq

April/2016-July2018

45%

3.             

General Directorate of Water / Ministry of Municipalities & Public Works

   Design and construction of AL-SALAM & AL-MANSOURIYA Water Treatment Plant of 88,000m3/day composed of:

         Intake structure

         Low lift pump house

         Flash mixer

         Four clarifiers of 38m diameter

         Twenty Filters of 40m2 area each

         Two concrete storage tank of 8,000m3 each

         Two High lift Pump houses

         Three Power buildings

         Sludge pit 500m3 capacity

         Chemical building

         Workshop building

         Admin building

         3 operator houses

         Engineer house

         3 guard rooms

         Fences

         Elevated steel tank of 25m height and 1100m3 capacity

         Transmission lines

  Ductile pipe (double flange) 700mm, length 350m.

  Ductile pipe 500mm, length 300m.

  Ductile pipe 1000mm, length 1250m.

  Ductile pipe 600mm, length 12,800m.

  Ductile pipe 900mm, length 27,600m.

  Ductile pipe 500mm, length 4,000m.

  Ductile pipe 300mm, length 1,000m.

  Ductile pipe 700mm, length 13,400m.

  Ductile pipe 500mm, length 4,200m.

  Ductile pipe 800mm, length 500m.

Dyala / Iraq

Jan. 2013 May 2017

52%

4.             

General Directorate of Water / Ministry of Municipalities & Public Works

         Design and construction of AL-SADA & AL-GOBOR Water Treatment Plant of 44,000m3/day composed of:

               Intake structure

               Low lift pump house

               Flash mixer

               Three clarifiers of 34m diameter

               Ten Filters of 40m2 area each

               One concrete storage tank of 4,000m3

               High lift Pump house

               Two Power buildings

               Sludge pit 400m3 capacity

               Chemical building

               Workshop building

               Admin building

               3 operator houses

               Engineer house

               3 guard rooms

               Fences

               Elevated steel tank of 25m height and 900m3 capacity

               Transmission lines

  Ductile Iron Pipe of 8km 500mm

  Ductile Iron Pipe of 1.5km 250mm

  Ductile Iron Pipe of 5.5km 400mm

  Ductile Iron Pipe of 1.65km 700mm

  Ductile Iron Pipe of 1.5km 500mm

Dyala / Iraq

Sep. 2012 March. 2017

66%

 

 PROJECTS EXECUTED BY AL-QABAS COMPANY

 

#

Client

Scope of project

Location

Duration

Start / End

%

Completed

5.             

JV HDGSK ( Hundayi Co., GSE Co. & SK Co.).

Karbala Refinery Project PKG 7

Karbala/Iraq

Sep/2015-May2018

58%

6.             

JV HDGSK ( Hundayi Co., GSE Co. & SK Co.).

Karbala Refinery Project PKG 8

Karbala/Iraq

April/2016-July2018

45%

7.             

General Directorate of Water / Ministry of Municipalities & Public Works

         Design and construction of AL-SALAM & AL-MANSOURIYA Water Treatment Plant of 88,000m3/day composed of:

         Intake structure

         Low lift pump house

         Flash mixer

         Four clarifiers of 38m diameter

         Twenty Filters of 40m2 area each

         Two concrete storage tank of 8,000m3 each

         Two High lift Pump houses

         Three Power buildings

         Sludge pit 500m3 capacity

         Chemical building

         Workshop building

         Admin building

         3 operator houses

         Engineer house

         3 guard rooms

         Fences

         Elevated steel tank of 25m height and 1100m3 capacity

         Transmission lines

  Ductile pipe (double flange) 700mm, length 350m.

  Ductile pipe 500mm, length 300m.

  Ductile pipe 1000mm, length 1250m.

  Ductile pipe 600mm, length 12,800m.

  Ductile pipe 900mm, length 27,600m.

  Ductile pipe 500mm, length 4,000m.

  Ductile pipe 300mm, length 1,000m.

  Ductile pipe 700mm, length 13,400m.

  Ductile pipe 500mm, length 4,200m.

  Ductile pipe 800mm, length 500m.

Dyala / Iraq

Jan. 2013 May 2017

52%

8.             

General Directorate of Water / Ministry of Municipalities & Public Works

         Design and construction of AL-SADA & AL-GOBOR Water Treatment Plant of 44,000m3/day composed of:

               Intake structure

               Low lift pump house

               Flash mixer

               Three clarifiers of 34m diameter

               Ten Filters of 40m2 area each

               One concrete storage tank of 4,000m3

               High lift Pump house

               Two Power buildings

               Sludge pit 400m3 capacity

               Chemical building

               Workshop building

               Admin building

               3 operator houses

               Engineer house

               3 guard rooms

               Fences

               Elevated steel tank of 25m height and 900m3 capacity

               Transmission lines

  Ductile Iron Pipe of 8km 500mm

  Ductile Iron Pipe of 1.5km 250mm

  Ductile Iron Pipe of 5.5km 400mm

  Ductile Iron Pipe of 1.65km 700mm

  Ductile Iron Pipe of 1.5km 500mm

Dyala / Iraq

Sep. 2012 March. 2017

66%

9.             

State Company for Oil Projects SCOP

Design and construction of Muftiya WTP 2x1000m3/h, Basrah / Iraq (Turnkey)

The contract includes design & supply of the following (all pile foundation)

         Low lift pump house with suction well

         Intake structure with sheet pile in Shat Al-Arab

         Two flash mixers

         Four clarifiers 27m

         Two intermediate pump houses

         Twenty pressure filters 2.4x6.5m

         Two steel storage tank of 5,000m3

         Diesel pump house

         Power house 2x600kVA diesel generator

         Two Sludge pits 400m3 capacity

         Two chemical buildings

         Two workshop buildings

         Admin & control building

  Two R.O. units 5m3/day

Basra / Iraq

Mar/2010 - March/2017

100%

10.          

Water Directorate / Ministry of Municipalities & Public Works

Design and construction of Hawija WTP 3000m3/h, Kirkuk / Iraq (Turnkey)

The contract includes design & supply of the following (all pile foundation)

         Low lift pump house with suction well

         One flash mixer with receiving well

         Three clarifiers 34m

         Ten filters 40m2 each

         Underground concrete storage tank of 4,000m3

         Power house diesel generator

         Sludge pits

         Chemical building

         Workshop building

         Admin & control building

         Two elevated (25m) steel storage tanks ( & MG)

         Laying water pipelines 500mm L3500m & 600mm L5500m

         Supply & installations of all mechanical & electrical & control equipment

Hawija / Iraq

Dec. 2008 Oct. 2010

100%

11.          

Ministry of Higher Education

Agriculture College, Babil University, 21 Building Complex, total area 28,000m2

Babil / Iraq

May 2008 Jun 2010

100%

12.          

Babil Governorate

Design, supply all construction materials for village service road of 29,100m for Babil Governorate. The project is composed of earth works, 25cm sub-base coarse, 10cm asphaltic concrete and 9 pipe culverts

Babil / Iraq

Feb. 2007 Apr. 2008

100%

13.          

General Directorate for Water / Ministry of Municipality and Public Works

Design and construct elevated steel tank of 500,000 Gallon capacity, Supply & installation & testing & operation of the elevated steel tank.

Abu Ghraib / Iraq

Dec. 2002 Aug. 2003

100%

14.          

General Corporation for Water & Sewage (GCWS) / Ministry of Municipality and Public Works

         Design and construction of Abu Graib Water Treatment Plant WTP of 22,000m3/day composed of:

      Two clarifiers of 26m diameter

      One concrete storage tank of 2,000m3

      Ten Filters of 40m2 area each

      Pump house

      Flash mixer

      Receiving well 200m3 capacity

      Power house 900kVA diesel generator.

      Sludge pit 100m3 capacity

      Chemical building

      Workshop building

      Transmission line

      Ductile Iron Pipe of 5.5km 600mm

      Elevated steel tank of 25m height and Million Gallon capacity

Abu Ghraib / Iraq

Dec. 2001 Aug. 2002

100%

15.          

State Commission for Maintenance of Irrigation Projects / Ministry of Irrigation

Construction of embankments and box culverts in south of Al-Qaim town to protect Al-Qaim town from rains

Al-Qaim / Iraq

Aug. 2001 Apr. 2002

100%

16.          

Water Directorate / Ministry of Municipalities & Public Works

Al-Thulueiya Irrigation Project, Design & Construct irrigation Concrete channels, concrete regular box culverts and care bridge

Thulueiya / Iraq

May 2000 Oct. 2002

100%

17.          

Ministry of Irrigation

Survey, design and earth work embankment of (4.5 5m) average height and (18 20m) width of 12,660m village road will all the pipes and box culverts

Missan / Iraq

Feb. 2000 Jan. 2002

100%

18.          

Salah Al-Deen Governorate

Supply all the construction materials to contract 8 military stores of 24.4mx50.8m and 8m height with all the electrical installation and water networks in Tikreet Camp

Salah- Al-Deen / Iraq

Jan. 2000 Oct. 2000

100%

19.          

Nineveh Governorate

Supply all the construction material, earth works, 30cm sub-base coarse and 20cm asphalt paving of 9,850m road to Al-MeshrakSulphure Company

Mosul / Iraq

Aug. 1999 Jan. 2001

100%

20.          

Planning Committee / Ministry of Planning

Supply all the asphaltic material needed for paving 21 KM asphaltic concrete binder and surface layer for roads in Al-Karkh side for planning committee

Baghdad / Iraq

Aug. 1999 Jan. 2000

100%

21.          

General Corporation for water & sewerage (GCWS) / Ministry of Municipality and Public Works

Tikret Sewerage Project. Design & supply all the concrete pipes of diameter 1,800mm for main sewage sewers with 32 manholes of height (2.00 6.5m) including repaving the roads with asphaltic concrete

Salah Al-Deen / Iraq

Mar. 1999 Aug. 2000

100%

22.          

State Organization for Roads and Bridges / Ministry of Housing and Construction

Survey, design and construct earth works and sub-base of 44,000m road between Emara and Al-Azear including pipe and box culverts

Missan / Iraq

Sep. 1998 Feb. 2001

100%

23.          

Ministry of Irrigation

Survey and design for embankment earth works of (3.8 4.3m) height and 22 25m) wide of 10,330m road to AL-Sakhriga village will all the pipes and box culverts

Al-Sakhriga / Iraq

Oct. 1998 Jul. 1999

100%

 

 SCOP :       State Company for Oil Projects                  SRC   :          South Refineries Company.

      NRC  :          North Oil Company.                                MHE :           Ministry of Higher Education.

  MMPW:      Ministry of Municipality & Public Works.

 

 

Hosting & Design By Babelccs